Risk Register Flexible CSV Uploads

Written by Brady Price

We provide flexible CSV uploads to make it easy for you to import your existing spreadsheets into the Secureframe platform without spending time formatting your data to match Secureframe’s templates.

Upload your risk register CSV in its current state and then quickly and easily match the columns in your existing spreadsheet with the fields in Secureframe following the bulk upload workflow below.

Once you import your CSV, follow the workflow to:

  • Select header row

  • Map columns from your spreadsheet (uploaded columns) to the template columns found in Secureframe

  • Fix any “invalid” fields that do not align with the Secureframe inputs

  • Review and finalize.

  • Import to your Secureframe risk register

Frequently Asked Questions (FAQ)

If I import a risk register with risks that have already been assessed, can I set their status to “Assessment Complete” in bulk?

  • Not at this time. All risks uploaded via CSV will default to a “Draft” status, regardless of their prior assessment state. If you'd like to update the status to “Assessment Complete,” each risk must be edited manually after the import.

Why did my risk register import fail or skip rows when Risk ID was filled in?

  • Imports with a populated Risk ID column should process normally.

  • If every row is skipped, Secureframe shows a warning instead of a hard error so you can fix the file and retry.